New Construction at Woodlawn Village

Share New Construction at Woodlawn Village on Facebook Share New Construction at Woodlawn Village on Twitter Share New Construction at Woodlawn Village on Linkedin Email New Construction at Woodlawn Village link

Overview

In 2011, the Villages at Belvoir garnered national acclaim for the Wounded Warrior Home Project, two concept homes designed by renowned architect Michael Graves to radically redesign the living spaces for the increasing number of Wounded Warriors returning to active duty. Using principles of universal design and lessons learned in the decade since, the construction at Woodlawn Village continues this important mission by delivering eleven new accessible homes and developing an additional 13 accessible home sites.

Plans and specifications comply with the 2015 International Residential Code and 2015 Virginia Building Code (i.e. the applicable codes for new construction in Fairfax County), and were reviewed and approved by the Commonwealth of Virginia, the Fort Belvoir Fire Department, and several third-party consultants approved by the Army. All new homes will undergo rigorous third-party and Army inspections during construction and prior to occupancy.


History of Woodlawn Village

For residents who may not know the history of Woodlawn Village, the neighborhood was developed by the Army around 1980. Following commencement of the Residential Communities Initiative (RCI) in December 2003, Woodlawn Village was targeted for significant upgrades during the project’s Initial Development Period. This included major renovations of the previously built 444 homes, including strategic conversion of 200 existing two-bedroom homes into 100 five-bedroom homes, which provided much-needed housing for larger families assigned to the post. Completed in 2011, Woodlawn Village’s transformation resulted in 336 renovated homes , the two new homes for Wounded Warriors, new playgrounds and amenity areas, and the largest neighborhood center in the Villages at Belvoir, highlighted by an outdoor pool, fitness facility, and indoor and outdoor entertainment space.

Wounded Warrior Homes in Woodlawn Villages

An Inside Look at the Improvements

The plan in 2011, as coordinated with the Army, was to build more single-family accessible homes in open plots of land, also known as “infill lots”, within Woodlawn Village. After several years of engineering, design, and coordination with the Army, the Villages at Belvoir secured approvals for additional accessible homes in Fall 2020.

The eleven new four-bedroom, 2100-SF accessible homes will build upon the elevated standards of design we set in 2011 and will feature brand new stainless steel appliances, quartz countertops, ceramic tiled bathroom floors and showers, water saving fixtures, and energy conserving Nest thermostats, as well as fenced backyards and two-car garages. The initial phase of this development also includes the infrastructure and sitework for all 24 accessible home locations. Similar to how master planned communities are often built off post, finishing lot development now for all accessible home sites will expedite the timeline to build additional accessible homes in the future.






Overview

In 2011, the Villages at Belvoir garnered national acclaim for the Wounded Warrior Home Project, two concept homes designed by renowned architect Michael Graves to radically redesign the living spaces for the increasing number of Wounded Warriors returning to active duty. Using principles of universal design and lessons learned in the decade since, the construction at Woodlawn Village continues this important mission by delivering eleven new accessible homes and developing an additional 13 accessible home sites.

Plans and specifications comply with the 2015 International Residential Code and 2015 Virginia Building Code (i.e. the applicable codes for new construction in Fairfax County), and were reviewed and approved by the Commonwealth of Virginia, the Fort Belvoir Fire Department, and several third-party consultants approved by the Army. All new homes will undergo rigorous third-party and Army inspections during construction and prior to occupancy.


History of Woodlawn Village

For residents who may not know the history of Woodlawn Village, the neighborhood was developed by the Army around 1980. Following commencement of the Residential Communities Initiative (RCI) in December 2003, Woodlawn Village was targeted for significant upgrades during the project’s Initial Development Period. This included major renovations of the previously built 444 homes, including strategic conversion of 200 existing two-bedroom homes into 100 five-bedroom homes, which provided much-needed housing for larger families assigned to the post. Completed in 2011, Woodlawn Village’s transformation resulted in 336 renovated homes , the two new homes for Wounded Warriors, new playgrounds and amenity areas, and the largest neighborhood center in the Villages at Belvoir, highlighted by an outdoor pool, fitness facility, and indoor and outdoor entertainment space.

Wounded Warrior Homes in Woodlawn Villages

An Inside Look at the Improvements

The plan in 2011, as coordinated with the Army, was to build more single-family accessible homes in open plots of land, also known as “infill lots”, within Woodlawn Village. After several years of engineering, design, and coordination with the Army, the Villages at Belvoir secured approvals for additional accessible homes in Fall 2020.

The eleven new four-bedroom, 2100-SF accessible homes will build upon the elevated standards of design we set in 2011 and will feature brand new stainless steel appliances, quartz countertops, ceramic tiled bathroom floors and showers, water saving fixtures, and energy conserving Nest thermostats, as well as fenced backyards and two-car garages. The initial phase of this development also includes the infrastructure and sitework for all 24 accessible home locations. Similar to how master planned communities are often built off post, finishing lot development now for all accessible home sites will expedite the timeline to build additional accessible homes in the future.






  • February 2021 - Construction Update

    Share February 2021 - Construction Update on Facebook Share February 2021 - Construction Update on Twitter Share February 2021 - Construction Update on Linkedin Email February 2021 - Construction Update link

    General Notes:

    • Project working hours will be from Monday to Friday between 07:00 and 18:00 and Saturday 09:00 to 18:00, except holidays.
    • Neighbors in Woodlawn Village should expect elevated levels of noise as well as increased vehicle traffic during the construction period. There will be an increase of activity outside of the construction fence lines as equipment and materials are delivered.

    Residents can help facilitate this work and ensure quality and safety for everyone by:

    • Not entering the site access gates.
    • Honoring the controlled work zones and do not cross the construction fence lines.
    • Large trucks will be required to perform work, please watch for trucks, equipment, and construction personnel.
    • Ensure that any pets kept in backyards cannot escape and enter the project site throughout the course of construction.

    Work performed during this period will include:

    • Sitework
    • Erosion and sediment controls
    • Utilities


  • November 2020 - Construction Look Ahead

    Share November 2020 - Construction Look Ahead on Facebook Share November 2020 - Construction Look Ahead on Twitter Share November 2020 - Construction Look Ahead on Linkedin Email November 2020 - Construction Look Ahead link
    • Substantial construction work is not expected to begin until January 2021, when workers will begin clearing and grading the new home sites

    • Once the home sites are cleared and graded, crews will make utility connections to electric, water, sewer, gas, and Verizon to the new home sites

  • October 2020 - Construction Look Ahead

    Share October 2020 - Construction Look Ahead on Facebook Share October 2020 - Construction Look Ahead on Twitter Share October 2020 - Construction Look Ahead on Linkedin Email October 2020 - Construction Look Ahead link
    • Construction fencing will be installed around the perimeter of the project site

    • Crew will mobilize construction equipment

    • Erosion and sediment controls will be installed

    • Existing pavement and landscaping will be cleared

Page last updated: 12 Apr 2022, 01:52 PM